£20,000 fine for asbestos failings
A leisure facility was accused of treating asbestos removal as a “DIY project”, exposing staff and members of the public to this hazardous substance. How did they get the job so wrong?
Two employees of a leisure centre were tasked with pulling out fixtures in a disused plant room ahead of a conversion. No asbestos survey was carried out, and the two used angle grinders and hammers to pull out pipework and lagging and a wheelbarrow to transport it through the building to a skip outside. They were not wearing protective masks or clothing. After carrying out this work for a couple of days, a friend of one of the employees alerted them that the material in the skip may be hazardous. Environmental consultants were brought in and confirmed that they were asbestos-containing materials (ACMs), which must only be removed by licensed contractors.
The local Council investigated and found that the company had no plan for the works. It just allowed the employees, who had no knowledge or training in how to deal with asbestos, to go about it in an ad hoc fashion. They were not supplied with PPE. After a day, one of the employees started using his own mask because he was “feeling rough” due to the dust. As well as the ACMs in the skip, investigators found remnants in the plant room and along the route used to transport it through the building.
The court heard that members of the public could have been exposed to asbestos fibres, in addition to the two employees who carried out the work.the leisure centre pleaded guilty to breaching its duty under ss.2(1) and 3(1) Health and Safety at Work etc. Act 1974 to ensure, so far as is reasonably practicable, the health, safety and welfare of its employees and others affected by its activities. It was fined £20,000 and ordered to pay over £5,000 in costs.
Related Topics
-
HMRC updates advisory fuel rates from 1 March 2026
HMRC has published the latest advisory fuel and electric rates (AFRs) for company cars, effective from 1 March 2026. Several rates have changed since the previous quarter. What should employers be aware of?
-
5 April deadline approaching for key tax relief claims
With the end of the 2025/26 tax year now less than seven weeks away, business owners and company directors should remember that several valuable reliefs and elections must be made before 5 April. Which opportunities are about to close?
-
HMRC reminds employers about payrolling benefits deadlines
HMRC is reminding employers of key dates and preparations ahead of the transition to real-time payrolling of benefits in kind (BiKs). With an important voluntary registration deadline approaching, what do payroll teams need to know?

This website uses both its own and third-party cookies to analyze our services and navigation on our website in order to improve its contents (analytical purposes: measure visits and sources of web traffic). The legal basis is the consent of the user, except in the case of basic cookies, which are essential to navigate this website.